Based on research results, risk in port construction projects is influenced by external non technical (22. This study aims to analyze the risk of port construction using a systematic literature review method. For this reason, a risk analysis is needed so that the implementation of port construction can be completed on time, in terms of cost, quality and time. Analisis Pelaksanaan Proyek Perumahan Dengan Metode CPM (Critical Path Method) dan PERT (Project Evaluation and Review Technique) (Studi Kasus Proyek Perumahan Citra Turi). ![]() Tujuan dari penelitian ini untuk menganalisis risiko pada proyek dan untuk mengetahui bagaimana. ![]() Ports as sea transportation infrastructure have a very important and strategic role for industrial and trade growth and are business segments that can contribute to the economy and national development because they are part of the chain of transportation and logistics systems. Penelitian kali ini merupakan studi kasus pada salah satu proyek konstruksi perumahan PT. ![]() The development of an infrastructure in the region can have the effect of increasing people's access to resources so that the increase in productivity can encourage economic growth.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |